Prices in
CANADIAN
Dollars
| No Duty - No Brokerage
Find Us
Products
Ceiling
Chandeliers
Pendants
Flushmounts
Semi-Flushmounts
Foyer
Track
All
Wall
Bathroom
Sconces
Swing-Arm
All
Outdoor
Wall
Hanging
Post Mounts
All
Fans
Indoor
Outdoor
All
Lamps
Task Lamps
Table Lamps
Floor Lamps
All
Promotions
Inspiration
Kitchen
Living Room
Bathroom
Bedroom
Dining Room
Outdoor
All
Coupon
Brands
Products
Ceiling
Chandeliers
Pendants
Flushmounts
Semi-Flushmounts
Foyer
Track
All
Wall
Bathroom
Sconces
Swing-Arm
All
Outdoor
Wall
Hanging
Post Mounts
All
Fans
Indoor
Outdoor
All
Lamps
Task Lamps
Table Lamps
Floor Lamps
All
Promotions
Inspiration
Kitchen
Living Room
Bathroom
Bedroom
Dining Room
Outdoor
All
Coupon
Brands
No Image
Available
Image may not reflect selected features
Pre-Bent S Curve MonoRail (700MOBHSC60BRZ)
by
Visual Comfort & Co. Architectural Collection
BROWN MO HORIZ. S-CURVE ANT.B
Product Specification
Item #
700MOBHSC60BRZ
Dimensions
Height: 0.60"
Width: 0.30"
Additional product details
Internal #
J9FKG
Category
Track Ltg.
Subcategory
Track Accessories
Finish
Bronze
Style
Contemporary
Option
Title 20
Category
Monorail Hardware
Finish
Antique Bronze
Style
Contemporary | Modern
Option
Dry Rated
Bulb Dimmable
False
Introduction Date
01/01/2005
Ship Carton Height
6.00
Ship Weight
3
Special Features
From the brand formerly known as Tech Lighting
Vendor Ship Method
UPS Fedex
Warranty
1 Year
Weight
1.10
24 Volt
False
Adjustable Head
False
Cable Field Cuttable
True
Cannot Ship To California
False
Cannot Ship To Canada
False
Damp Rated
False
Dark Sky
False
Dry Rated
False
FWC Compliant
False
Integrated LED
False
Item Color 1
Brown
Master Color
Brown
Motion Sensor Included
False
Photocell Included
False
Replaceable Lamp
False
Reversible
False
Safety Rating
ETL
Shape
Pre-bent S-curve
Sloped Ceiling Compatible
False
Solar Powered
False
SORAA
False
Stocking Type
Made to Order
System
MonoRail
Title 20
False
Title 24
False
Transformer Required
False
Warm Color Dimming
FALSE
WET IP65
False
Wet Rated
False
Manufactured By
Visual Comfort & Co. Architectural Collection
Finish
Additional options that would change other selections
Item Color 1
Additional options that would change other selections
Master Color
Additional options that would change other selections
Call for Price
Qty:
pkgs
pcs
BASE PRICE:
$
512
00
/
/ 1
($512.00 / 1)
Save
%
List Price:
$
Add To Cart
Add To Cart
Add To Estimate
Add To Wishlist
Save To Compare
Availability:
Manufacturer availability unknown. Please call 416-690-2544, or email
[email protected]
, for in-store availability.
To:
From:
Subject:
Hello, take a look at this great item that I found at Living Lighting Beaches .
Send Email
Similar Products
View all
Matched by: